Working over water
Temporary access and protection must reach the structure above the Yarra while controlling a complex work zone below.


Feature project
In progressMelbourne, Victoria
Restoring a Melbourne landmark while the city continues around it.
Explore the projectProject overview
Built in 1888, Princes Bridge crosses the Yarra at Swanston Street and connects Melbourne's central city with Southbank and the arts precinct. Stokes Rousseau is leading a three-year restoration designed to preserve the bridge's heritage character and structural integrity for the future.
What had to be solved
Princes Bridge is part road, tram route, pedestrian link, river crossing and civic landmark. The restoration has to account for each condition at once.

Temporary access and protection must reach the structure above the Yarra while controlling a complex work zone below.
Staging must account for traffic, pedestrians, river activity and limited working windows in a highly visible public setting.
Stone, steel and decorative elements call for specialist conservation thinking, careful repair and consistent quality control.

The Stokes response
The visible restoration depends on the planning behind it. Stokes brings the client, heritage architect, access team and specialist trades into one practical sequence of work.
The programme is broken into workable stages around access, movement, events and the needs of the broader precinct.
Purpose-built temporary works and protected work areas make it possible to reach the bridge from the river edge and below the deck.
Stokes leads the client, heritage architect, access teams and specialist trades through one coordinated delivery plan.
Outcome
Restoration remains in progress. The intended outcome is a renewed bridge that protects its historic fabric, structural integrity and role in Melbourne's public realm. Final completion details will be published when approved.
Current statusIn progress

Project evidence